Strategic Engagements
A track record of successfully executed infrastructure, pipeline, and energy projects across Nigeria.
24" x 51km Gas Transmission Pipeline
Engineering, Procurement, and Construction for 24" x 51km Gas Transmission Pipeline and Metering Station at Calabar in Cross River State (Onshore Part of the Lot 3).
- Engineering, Procurement, and Construction
- Gas Metering Station
- Onshore Pipeline
Gas Supply Infrastructure to SMCL
Engineering, Procurement and Construction (EPC) of Gas Supply Infrastructure (6" x 0.034km; Pressure Reduction and Gas Metering Facilities) to Standard Metallurgical Company Limited (SMCL), JV Contract in Petrotrans-Enikkom JV Limited.
- 6" x 0.034km Pipeline
- Pressure Reduction Facilities
- Gas Metering Facilities
Escravos-Lagos Gas Pipeline Expansion Phase I
Construction, Installation and Testing of 30" Pipeline Segment by Thrust Boring Method under Road Between Warri to Oben for ZAKHEM.
- 30" Pipeline Segment
- Thrust Boring Method
- Installation and Testing
24" x 18km and 16" x 16.5km Gas Pipeline
Construction of 24" x 18km and 16" x 16.5km Gas Pipeline from Itoro to Ibeshi. Subcontract from ZAKHEM.
- 24" x 18km Pipeline
- 16" x 16.5km Pipeline
- Pipeline Construction
Benin City Gas Distribution Project Phase II
Laying, Testing and Commissioning of 8" & 4" (Dia) Steel Gas pipeline for NIPCO Benin City Gas Distribution Project.
- 8" Steel Gas Pipeline
- 4" Steel Gas Pipeline
- Laying, Testing and Commissioning
Escravos-Lagos Gas Pipeline Expansion Phase II
Construction, Installation and Testing of 36" Pipeline Crossings from KP 294+000 to KP 333+300 by Thrust Boring Method under Road Between Lagos and Ogun States.
- 36" Pipeline Crossings
- Thrust Boring Method
- Installation and Testing
20" x 1.3km Shore Pull Pipeline
Clearing of ROW, Transportation of Line Pipes, and Pig Launcher, Stringing, welding, NDT and FJC of 20" X 1.3 km of pipeline for shore pull, Installation of 0.7 Km Onshore Pipeline, and Tie-in of Onshore Pipeline to Offshore Pipeline.
- Transportation of Line Pipes & Pig Launcher
- Welding, NDT and FJC of 20" X 1.3 km Pipeline
- Installation of Pig Launcher
- Tie-in to Offshore Pipeline
- Cleaning, Gauging and Hydrotesting